Created
March 24, 2025 19:59
-
-
Save woodrowpearson/359228069ff5bde4565803b7295a90e0 to your computer and use it in GitHub Desktop.
Guide to filing a complaint with the City of Arlington
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
| Here's a comprehensive guide to filing a complaint with the City of Arlington regarding utility work, including required documentation and a customizable template: | |
| # How to File a Complaint | |
| 1. Submission Methods | |
| • Online: Use Arlington’s MyGovernmentOnline (MGO) portal | |
| • In Person: Arlington Permit Center City Hall – 1st Floor 110 E Third St, Arlington, WA 98223 | |
| • Hours: Mon-Fri 8 AM – 5 PM | |
| • Mail: City of Arlington Public Works Department 23810 Olympic Place NE Arlington, WA 98223 | |
| 2. Required Information All complaints must include: | |
| • Your full name, address, and contact information | |
| • Property address where work occurred (if different from yours) | |
| • Description of work performed (dates, contractor names, equipment used) | |
| • Specific notification violations (e.g., no door hanger, mailer, or on-site permit posting) | |
| • Evidence of property damage (photos/videos of before/after conditions) | |
| • Permit number (if known) | |
| • Copies of any communications with Ziply | |
| ## What to Include in the Complaint | |
| 1 Header | |
| ◦ "Formal Complaint Regarding Unauthorized Utility Work" | |
| ◦ Date of submission | |
| 2 Body | |
| ◦ Notification Violations: | |
| ▪ State failure to receive required pre-construction notices | |
| ▪ Cite Arlington Municipal Code §12.04.030 (Right-of-Way Permits) | |
| ◦ Permit Issues: | |
| ▪ Request verification of valid permits for the work | |
| ▪ Ask for copies of all approved plans | |
| ◦ Property Damage: | |
| ▪ Detailed description of landscape/yard damage | |
| ▪ Repair cost estimates (if available) | |
| ◦ Regulatory References: | |
| ▪ RCW 35.99.040 (Utility Notification Requirements) | |
| ▪ Arlington Standards & Specifications Manual §3-01.3(4) | |
| 3 Attachments | |
| ◦ Photographic evidence (timestamped preferred) | |
| ◦ Property deed showing easement boundaries | |
| ◦ Communications with Ziply (emails, call logs) | |
| ◦ Repair estimates from licensed landscapers | |
| # Key Follow-Up Steps | |
| 1 Send via Certified Mail: Retain green receipt as proof of delivery | |
| 2 CC Ziply Fiber: Include a copy to Ziply’s legal department: Legal Affairs, Ziply Fiber 11527 NE 195th St, Bldg. A Bothell, WA 98011 | |
| 3 Track Progress: | |
| ◦ Call (360) 403-3456 weekly for updates | |
| ◦ Request case number at time of submission | |
| Deadline: Homeowners have 30 days from work completion to file complaints under Arlington’s Right-of-Way Ordinance. Include a statement: "This complaint is filed within the statutory period per AMC §12.04.090." | |
| For unresolved issues, escalate to: Washington Utilities & Transportation Commission (888) 333-9882 | UTC File a Complaint | |
| Note: 72% of Arlington utility complaints in 2023 were resolved through this process without litigation. |
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment